Recent Blog Posts

PSI Explained: Safety Systems

August 8th, 2017

Title 8 CCR §5189(d)(3)(A)(8) and Title 29 CFR §1910.119(d)(3)(i)(H) requires that “information pertaining to the equipment in the process shall include: Safety systems (e.g. interlocks, detection or suppression systems)”. At minimum, Safety Systems documentation must identify and summarize all Safety Systems associated with the chemical process. Once developed, this documentation will serve as a useful […]

Mechanical Integrity 101 | Emergency Refrigerant Control Boxes

February 19th, 2013

Although Emergency Control Boxes (ECB) are no longer required by the current Fire Codes, most systems across the country are still equipped with an ECB that must be maintained and inspected during a mechanical integrity inspection. So what should an inspector look for when inspecting an ECB? Here are a few points to consider… The […]