PHA Logistics (Part 4)

4-good

It is ideal to perform the PHA at the site where the process being studied is located. This provides opportunity to verify the system configuration if needed. The PHA team will need to meet in a room that is large enough to comfortably seat each team member. Prior to meeting as a team, all logistical needs should be worked out such as computer connections, audio/visual, etc. It is also advisable to schedule regular breaks throughout the PHA to improve team focus. Depending on the size and complexity of the process involved, the activity may take an entire day or multiple days. In most cases, the facility will desire to account for lunch breaks as well.


This is Part 4 of a series on PHAs. You can access previous blogs in this series below:

Leave a Reply

Your email address will not be published. Required fields are marked *